Uncrating And Inspecting The Unit; Inspecting Before Removing Outer Container; Removing The Unit From Shipping Container - Jeio tech TC-ME-025 Operating Manual

Table of Contents

Advertisement

3.1 Uncrating and inspecting the unit

3.1.1 Inspecting before removing outer container

After you have received your Jeio Tech product, inspect the shipping container carefully for any damage that
may have occurred during shipping. Report any damage to the carrier and to your local Jeio Tech office or
the distributor from which the unit was purchased. If the container and packing materials are in re-usable
condition, save them for reshipment if necessary.

3.1.2 Removing the unit from shipping container

The unit is shipped on a wooden skid with an outer and inner container. The wooden outer container is
bolted to the shipping skid and has a protective vinyl cover stapled to the container's top. Under the outer
container the incubated shaker is covered with a cardboard box and strapped to the skid.
We have segmented the process into 3 phases. Use the following instructions to remove the incubated
shaker from the outer and inner containers
Figure 3.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc-me-065Tc-me-100

Table of Contents