Testing Film Samples
8.
Close the Fill Valve and remove the syringe.
9.
Start a ReZero examination using the GoTo control.
Humidifier Ports and Controls
The ports and controls used to fill the Water Reservoir used for Generated RH testing are illustrated in the
figure and table below.
1
Item
Name
1
Water Reservoir - Test Gas
2
Water Fill/Drain Port - Test Gas
3
Water Fill/Drain Valve - Test Gas
4
Reservoir Fill Line
6-6
2
3
Figure 6-1: Humidifier Fill Ports
Table 6-1: Humidifier Ports and Controls
Description
Window showing the Test Gas Reservoir water level
The fill port for the Test Gas Humidifier
The knob used to open & close the Test Gas fill port
The maximum level to which the reservoir should be filled.
Revision G
AQUATRAN 3/38 Operator's Manual
4
MOCON, Inc.