Step 10: Energize the System

A. Turn ON the AC disconnect or circuit breaker for the branch circuit.
B. Turn ON the main utility-grid AC circuit breaker. Your system starts producing power after a
five-minute wait time.
C. Check the LED on the connector side of the microinverter:
LED color
Flashing green
Flashing orange
Flashing Red
Solid Red

Set Up and Activate Monitoring

Refer to the Enphase IQ Envoy Quick Install Guide to install the IQ Envoy and set up system monitoring
and grid management functions. This guide leads you through the following:
Connecting the Envoy
Detect devices
Connecting to Enlighten
Registering the system
Building the virtual array
NOTE: When the utility requires a profile other than the default IEEE 1547 (for example
grids managed by Hawaii Electric Industries [HEI] including HECO) you must select an
appropriate grid profile for your installation. You can set the grid profile through
Enlighten, during system registration, or through Installer Toolkit at any time. You must have
an Enphase Envoy communications gateway to set or change the grid profile. For more
information on setting or changing the grid profile, refer to the Enphase IQ Envoy Installation
and Operation Manual at enphase.com/support.
21
Indicates
Normal operation. AC grid function is normal there is communication
with the IQ Envoy.
The AC grid is normal but there is no communication with the IQ
Envoy.
The AC grid is either not present or not within specification.
There is an active "DC Resistance Low, Power Off Condition." To
reset, see "DC Resistance Low – Power Off Condition" on page 22.
© 2018 Enphase Energy Inc. All rights reserved.
IQ 7 / IQ 7+ / IQ 7X Micro Installation and Operation
141-00043-02