Icom IC-M506GE Instruction Manual page 44

Table of Contents

Advertisement

7
DSC OPERATION
D Transmitting a Test Acknowledgement call
When the "TEST ACK" in DSC settings is set to 'Auto' (p. 61),
the transceiver automatically transmits a reply call when re-
ceiving a Test call.
Quick ACK:
q When a Test call is received, alarm sounds and the screen
shown below is displayed.
Push [ALARM OFF] to stop the alarm.
• Even if you do not push [ALARM OFF], the alarm stops after 2
minutes, and then the screen in step w is displayed.
w Push [ACK].
• Push [IGN] to ignore the call and return to the normal operating
mode.
• Push [INFO] to display the Test call information.
38
About Received call information:
• Push [IGN] to ignore the call and return to the normal operating
mode.
• Push [BACK] to return to the previous screen.
• Push [ACK] to go to the next step.
e The Test ACK confirmation
screen is displayed.
Push [CALL] to transmit the
acknowledgement call.
• Push [EXIT] to return to the
normal operating mode.
r While transmitting the ac-
knowledgement
call,
screen shown to the right is
displayed, and then returns
to
the
normal
operating
mode.
the

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IC-M506GE and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ic-m506

Table of Contents