Jeep Wrangler Sport 2010 Manual page 173

Table of Contents

Advertisement

1. File or sand the remaining port back until a flat surface is obtained (plane normal to port axis).
2. Drill out the port base using a 7/16" (brake booster port) or 11/32" (LDP/speed control port ) drill bit.
3. Using a 1/4"-18 NPT (brake booster port) or 1/8"-18 NPT (LDP/speed control port ) pipe tap, cut internal
threads. Use caution to start tap in a axis same as original port.
4. Apply Mopar® Thread Sealant to threads of repair port (s).
5. Install repair port (s). Do not over torque repair port (s).
Removal
UPPER INTAKE MANIFOLD
Fig. 210: Hose Assembly & IAT Sensor
Courtesy of CHRYSLER LLC
1. Disconnect and isolate the negative battery cable.
2. Disconnect the Inlet Air Temperature (IAT) sensor electrical connector (2).
3. Remove air inlet resonator to throttle body hose assembly (1).
viernes, 1 de octubre de 2021 05:18:32 p. m.
2010 Jeep Wrangler Sport
2010 ENGINE 3.8L - Service Information - Wrangler
Page 173
© 2011 Mitchell Repair Information Company, LLC.

Advertisement

Table of Contents
loading

Table of Contents