5 STARTUP AND SHUTDOWN
Read the technical documentation
Before installing and using the device, make sure you have read and understood all
the instructions contained in the present manual and in the technical supporting
documentation.
Further information
In the event that the information provided in this manual is not sufficiently exhaustive,
please contact the manufacturer of the device, whose details are available in the
"Contacts" section.
External isolators
 BCB refers to internal battery circuit breaker when the configuration is for internal
batteries.
 BCB refers to both internal and external battery circuit breaker when the
configuration is with external batteries and its auxiliary contacts properly wired
to the UPS terminals..
5.1 PRELIMINARY CHECKS
Before starting up the unit, make sure that:
 all installation and electric connection works have been performed professionally;
 all power and control cables have been properly and tightly connected to the relevant terminal
boards;
 the ground cable is properly connected;
 the battery polarity is correct and the voltage is within the operating values;
 the phase rotation of the line is correct and the voltage is within tolerance with the operating
values.
 the emergency power off "EPO" push-button, if installed, is not pressed (if not, press it back to
the rest position).
70
OMW07096 REV. E
Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA

Advertisement

loading