NOTES: If the internal battery are already installed inside the UPS
C) Carry out the operations as indicated in the following label installed
Figure 30 – Warning indications for internal battery
D) Follow the instructions from point 18 to point 23 of this chapter
2) Connect the 2 cables
3) Connect the 2 cables
4) Connect the 2 cables
Picture 30A - Battery terminals
52
OMW07096 REV. E
Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
inside the UPS
"+B"
on the battery terminal
"N"
on the battery neutral terminal
"-B"
on the battery terminal