Download Print this page

LEGRAND KEOR HPE 60 kVA Operating Manual page 1058

Hide thumbs Also See for KEOR HPE 60 kVA:

Advertisement

Available languages

Available languages

5) On Level no. 1, insert trays no. 1-2-3 in compliance with the position as demonstrated in Picture 12.
NOTES: On trays no. 1 and no. 3 check the circled jumper are not connected,
Picture 12 - View from above Level No.1
6) Wire level no. 1 as indicated in Picture 13. Leave the circled jumpers disconnected.
Picture 13 - View from above Level No.1 with battery connections
42
OMW07096 REV. E
Installation and start-up of KEOR HPE UPS 60÷80 kVA
Installation et démarrage de l'ASI KEOR HPE 60÷80 kVA
Installazione e avviamento KEOR HPE UPS 60÷80 kVA
leave the circled jumper disconnected.
Figure 13

Advertisement

loading