After Engine Shutdown; Operation Break - Volvo Penta D5 Operator's Manual

Table of Contents

Advertisement

Engine Shutdown
34

After Engine Shutdown

D7A T, D7A TA, D7A-B TA, D7C TA, D7C-B TA
Check the engine and engine bay for leakages.
Close the fuel tap.
Close the sea cock where fitted.
Take an hour meter reading and carry out
preventive maintenance according to the
maintenance schedule.
Turn off the main switch before any long stoppage.

Operation Break

Operation break with the boat in water
If the boat is not used, but left in the water, we
recommend you to warm up the engine at least once
every fortnight. This will prevent corrosion damage in
the engine.
If you expect the boat to be unused for two months or
more, we recommend you to preserve the engine,
please refer to Storage, page 65.
47713336 03-2021 © AB VOLVO PENTA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D7

Table of Contents