iCAP Customer Familiarisation Manual
Inset the tubing with the green valve fitting
and the carrier uptake tube (bubbler) into
the white/white peristaltic pump tubing:
Attach the pump tubing onto the peristaltic
pump so that the bubbler runs counter
clockwise across the pump:
Screw the green valve fitting into port 5 on
the valve head:
Next take the white valve fitting tube and
attach one end to port 3 on the valve head:
Page 18 of 72
This document is part numbered 849940090071
Version 1.02