Brief instructions on commissioning
2.1 Commissioning on PROFIBUS DP
2.1.6
Creating a user program
Procedure
1. Generate the user program in the LAD / STL / FAD Editor in the OB 1.
Example: Reading in the inputs and activating an output
STL
U I 0.1
U I 0.2
= Q 4.0
2. Save the project in the SIMATIC manager.
3. Download the configuration to the DP master.
2.1.7
Switching on ET 200M
Procedure
1. Switch on the power supply at the ET 200M.
2. Observe the status LEDs on the DP master and the ET 200M
– CPU 315-2 DP:
– ET 200M:
Carrying out a dry run
1. Press the two buttons on the ET 200M alternately (refer to the figure in chapter "Wiring the
ET 200M (Page 25)").
The LEDs of inputs E0.1 and E0.2 light up alternately.
The channel status display 0 (LED of output A4.0) and the indicator lamp do not light up.
2. Press the two buttons simultaneously.
The LEDs of inputs E0.1 and E0.2 light up alternately.
The channel status display 0 (LED of output A4.0) and the indicator lamp light up.
30
DC5V: ON
SF DP: OFF
BUSF: off
SF: OFF
BF: OFF
ON: ON
Description
If input E 0.1 is set and
input E 0.2 is set, then
assign the VKE to output A 4.0
Operating Instructions, 04/2022, EWA-4NEB7806006-09
ET 200M