Mounting The Et 200M - Siemens SIMATIC ET 200M Operating Instructions Manual

Distributed i/o device
Hide thumbs Also See for SIMATIC ET 200M:
Table of Contents

Advertisement

Brief instructions on commissioning
2.1 Commissioning on PROFIBUS DP
Number
1
Approx.
2 m
2
1
2.1.2

Mounting the ET 200M

Procedure
1. Mount the rail on a firm base so that there is at least 40 mm clearance above and below the
rail.
2. Starting from the left side, mount the individual modules on the rail (plug in the bus
connectors (not for PS 307 and the last module) – engage – swing in – screw down).
Observe the following sequence:
– Power supply PS 307
– Interface module IM 153-2
– DI module SM 321
– DO module SM 322
3. Set PROFIBUS address 3 on the interface module IM 153-2.
Figure 2-2
24
Item
Tool for crimping wire-end ferrules
Stranded wire with 1 mm
2
appropriate wire end ferrules, type A, length 6 mm
one-pin on button
24 V indicator lamp
Setting PROFIBUS address 3
cross section with
Operating Instructions, 04/2022, EWA-4NEB7806006-09
Order number (Siemens)
commonly available
commonly available
commonly available
commonly available
ET 200M

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents