Appendix
Commissioning order
Email this request form, together with the system scheme, to your local Viessmann sales office.
A competent employee must be present when the system is commissioned.
System details:
Requester
System location
Checklist:
Hydraulic scheme for heating system included
=
Heating circuits fully installed and filled
=
Electrical installation completed
=
Hydraulic lines fully thermally insulated
=
Installation completed in full up to refrigerant circuit
=
All windows and external doors airtight
=
Components for cooling mode fully installed (optional)
=
Components for ventilation fully installed (optional)
=
Components for photovoltaic system fully installed (optional)
=
Preferred appointment:
1.
Date
Time
2.
Date
Time
The work requested from Viessmann will be billed to me/us in accordance with the latest Viessmann pricelist.
Place/date
Signature
Final decommissioning and disposal
Viessmann products can be recycled. Components
and substances from the system are not part of ordi-
nary domestic waste.
Complete units and compressors are only to be dis-
posed of via qualified disposal specialists.
Observe the following regulations:
Fluorinated greenhouse gas regulation 517/2014/EU
■
■
Currently applicable regulations and requirements
164
Isolate the system from the power supply for decom-
missioning. Allow any hot components to cool down.
All components must be disposed of correctly.
Note
Before commencing decommissioning, note the
"Checklist for maintenance work" on page 136.