Power-On Commissioning; Checking Before Power-On; Connecting The Battery Supply - Huawei SmartLi 2.0 User Manual

Hide thumbs Also See for SmartLi 2.0:
Table of Contents

Advertisement

SmartLi 2.0
User Manual

5.1 Checking Before Power-On

Step 1 Check that the UPS is powered on and works properly in normal mode.
Step 2 Check that the ready switch on the BCU is in ready state.
Figure 5-1 Ready state
----End

5.2 Connecting the Battery Supply

Step 1 Start the BCU. The status of the running indicator and fault indicator on the BCU
changes accordingly, as described in
Issue 10 (2022-04-30)
5
Single SmartLi cabinet: Hold down the POWER ON/OFF button on the BCU of
the SmartLi for more than 2s.
Multiple SmartLi cabinets are connected in parallel: Hold down the POWER
ON/OFF button on the BCU of each SmartLi for more than 2s.
Copyright © Huawei Technologies Co., Ltd.

Power-On Commissioning

Table
5-1.
5 Power-On Commissioning
87