Huawei SmartLi 2.0 User Manual page 25

Hide thumbs Also See for SmartLi 2.0:
Table of Contents

Advertisement

SmartLi 2.0
User Manual
Table 2-5 Port description
No.
1
2
3
4
5
6
7
8
9
In a parallel lithium battery system, activating the EPO signal of a single lithium
battery cabinet triggers only emergency power-off of the lithium battery cabinet,
which does not affect normal charge and discharge of other lithium battery
cabinets in the system.
Issue 10 (2022-04-30)
Silk Screen
PARALLEL1
PARALLEL2
RS485
FE
COM
MDU
DO_1
DO_2
EPO
NO
12V
NC
12V
NO TICE
Copyright © Huawei Technologies Co., Ltd.
Port Name
Description
Parallel port
Inter-cabinet parallel signal port 1
Parallel port
Inter-cabinet parallel signal port 2
Northbound
Connects to a third-party network
communicati
management device over two wires.
ons port
Network port
Connects to a northbound network
management device or the customer's
web service.
Northbound
Connects to an UPS.
communicati
ons port
DB26
Connects to the MUS05A (DB26) port
on the MDU for power supply and
communication.
Output dry
Output dry contact 1 function setting
contact
for the lithium battery cabinet
Output dry
Output dry contact 2 function setting
contact
for the lithium battery cabinet
EPO port
If the normally open (NO) signal port
is connected to the EPO_12V port,
emergency power-off (EPO) is
triggered.
If the normally closed (NC) port is
disconnected from the EPO_12V port,
EPO is triggered.
2 Product Overview
18

Advertisement

Table of Contents
loading

Table of Contents