Keysight Technologies N5247B Service Manual page 263

2-port and 4-port pna-x microwave network analyzer
Hide thumbs Also See for N5247B:
Table of Contents

Advertisement

Replaceable Parts
Replaceable Parts Listings
Refere
Part Number
nce
A22
N5240-60059
Version 8 N5242-60136
b
A55
Version 7 N5242-60135
Version 7
N8985A
Version 7 N5242-60134
1420-0356
a. For the latest information on CPUs and associated drives, visit http://na.support.keysight.com/pna/hdnumbers.html.
b. The A55 solid state disk drive for the 2.2 GHz CPU board plugs into the A21 CPU board assembly from the rear panel. Refer to
"Removing and Replacing the A55 Solid State Drive (SSD)" on page 7-60
c. You can learn your System CPU version using the PNA software. On the PNA front panel, press Help > About Network Ana-
lyzer. In the window displayed, find "System CPU Version."
d. For more information on the N8985A SSD, refer to the Windows 10 Operating System Upgrade Kit Installation Note, available
online at
https://www.keysight.com/us/en/assets/9018-04733/installation-guides/9018-04733.pdf
(N8985-90001).
e. The lithium battery is located inside the A21 CPU board assembly. Refer to
tery" on page 7-90
for an illustration.
Keysight N5247B Service Guide
Qty
Description
1
GPIB board
1
Solid state drive (SSD) for Windows 10 Operating System- to be used with
the Version 8 System CPU
Solid state drive (SSD) for Windows 10 Operating System- to be used with
the Version 7 System CPU
Solid state drive (SSD) upgrade for Windows 10 Operating System- to be
d
used with the Version 7 System CPU
Solid state drive (SSD) for Windows 7 Operating System- to be used with
the Version 7 System CPU
1
Battery, lithium manganese dioxide, 3V, 0.22A-hr.
c
c
c
c
e
for an illustration.
"Removing and Replacing the Lithium Bat-
6-25

Advertisement

Table of Contents
loading

Table of Contents