Removing And Replacing The Front Panel Led Boards - Keysight Technologies N5247B Service Manual

2-port and 4-port pna-x microwave network analyzer
Hide thumbs Also See for N5247B:
Table of Contents

Advertisement

Repair and Replacement Procedures

Removing and Replacing the Front Panel LED Boards

Removing and Replacing the Front Panel LED Boards
Tools Required
— T-10 TORX driver (set to 9 in-lb)
— T-20 TORX driver (set to 21 in-lb)
— 5/16 inch open-end torque wrench (set to 10 in-lb)
— 1 inch open-end torque wrench (set to 72 in-lb)
— ESD grounding wrist strap
Removal Procedure
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary to remove the assembly. However, do not
over-bend the semirigid cables.
1. Disconnect the power cord.
2. Remove the test port couplers. Refer to
3. Remove two screws from the LED board to be removed and remove the
Replacement Procedure
1. Reverse the order of the removal procedure.
2. Perform the post-repair adjustments, verifications, and performance tests
7-86
A33–A36 Test Port Couplers" on page
LED board from the analyzer. For the location of the screws, see
6-71 on page
6-199.
that pertain to this removal procedure. Refer to
"Removing and Replacing the
7-46.
Table 7-2 on page
Keysight N5247B Service Guide
Figure
7-92.

Advertisement

Table of Contents
loading

Table of Contents