Daikin altherma 3 M Service Manual page 196

Hide thumbs Also See for altherma 3 M:
Table of Contents

Advertisement

3
|
Components
To perform a power check of the noise filter PCB
Service manual
196
Prerequisite: First perform a functionality check of the noise filter PCB, see
"Checking
procedures" [
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
1 Remove the required plate work, see
DANGER: RISK OF ELECTROCUTION
Confirm the rectifier voltage is below 10  V  DC before proceeding, see
electrical
hazards" [
2 Remove the 3 screws from the main PCB heat sink cover.
3 Lift and pull the cover to remove it from the heat sink.
f
a Heat sink cover screw
b Heat sink cover
c Wires U, V and W
d Ground wire screw
e Main PCB mounting plate
f Main PCB mounting plate fixation screw
4 Disconnect all connectors from the main PCB.
5 Loosen the screws to disconnect the U, V and W wires.
6 Cut all cable ties that fix cables to the main PCB mounting plate.
7 Loosen the screw to disconnect the ground wires from the main PCB
mounting plate.
8 Remove all main PCB mounting plate fixation screws.
4
 194].
"3.17 Plate
4
 285].
d
4
work" [
 230].
"To prevent
e
f
a
b
a
a
f
c
f
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents