Test operation and lighting sequence

It may take approximately two hours of operation for the logs to achieve their full flame pattern and
glow. During this burning in period some smoke and smell may be experienced. The appliance
should run on the high setting in a well ventilated room until these dissipate. It is important to check
the flame pattern during this time.
Abnormal flame pattern
Abnormal flame performance and/or flame pattern can indicate a problem with the fire such as
blocked gas injectors or log set that may have shifted. There are some warning signs that could
indicate a problem.
-
Unusual smell from the appliance
Continued difficulty or delay in establishing a flame
-
-
Flame appears either very short or very long
-
Flame only burns part way across the burner
-
Severe soot building up on the inside of the glass door
Important
It is the responsibility of the installer to check that under normal conditions of the appliance, all flue
gases are exhausted to the outside atmosphere and that there is no spillage of combustion gases
into the room.
If the appliance cannot be made to perform correctly please contact Rinnai.
Normal flame pattern
18 | Symmetry RDV3611 installation guide 11156-H 08-21
Abnormal flame pattern