Installation overview

Read these instructions to get an overview of the steps required before starting the installation.
Failure to follow these instructions could cause a malfunction of the appliance. This could result in
serious injury and/or property damage.
Unpack the appliance and components, and check for damage. Do not install any damaged parts.
Check all components have been supplied and that you have the correct gas type.
Adapt steps as necessary to suit the installation, for example new build or renovation—order of
steps may vary.
Build the frame and complete
the electrical connection.
Install ducting kit, if
purchased—separate
instruction.
Commission unit and uprate
if an LPG unit with a vertical
termination.
* In some instances (renovation), if there is gas supply to the unit, it would be better to commission before cladding, as
removing the unit, should installation problems occur, becomes difficult if the cladding has already been applied.
10 | Symmetry RDV3611 installation guide 11156-H 08-21
Install mounting brackets, the
Symmetry unit, and fix the unit
to the frame.
Install cladding*, refer
important note on p. 13.
Install frames, refer separate
instruction with each frame kit.
Install the flue and complete
the gas connection.
Install flue restrictor (if
required) and log set.
Complete installation checklist
(in Operation guide) and
complete customer handover.