Rinnai Ember Series Installation Manual
Hide thumbs Also See for Ember Series:

Advertisement

Quick Links

Installation guide
Ember
Models:
RDV600N/RDV600L
RDV700N/RDV700L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Ember Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Rinnai Ember Series

  • Page 1 Installation guide Ember Models: RDV600N/RDV600L RDV700N/RDV700L...
  • Page 2: Table Of Contents

    Important: Before you start ............4 Ember specification ...........5 Dimensions ..............6 Appliance must be installed with a Rinnai approved flue Gas and electrical supply ..........8 system. Enclosure dimensions ..........9 This appliance shall be installed in accordance with: Clearances from combustibles ........10 - Manufacturer’s installation instructions...
  • Page 3: Before You Start

    Ember specification Unpack the appliance and components and check for damage. DO NOT install any damaged items. Ember 600 specification summary For efficient performance Rinnai recommends Check all components have been supplied and that you have the correct gas type. Input = 12-23 MJ/h installing the fire as close to the floor as possible.
  • Page 4: Dimensions

    Dimensions (mm) Ember 600 with 4-sided frame (mock chimney installations) Ember 700 with 4-sided frame (mock chimney installations) 540 mm 640 mm Viewable glass Viewable glass dimensions, same dimensions, same for both 600 for both 700 models models Ember 600 with 3-sided frame (masonry installations or mock Ember 700 with 3-sided frame (masonry installations or mock chimney installations with a hearth) chimney installations with a hearth)
  • Page 5: Enclosure Dimensions

    If the supply cord is damaged, it must be replaced by a licensed tradesperson. This must be a genuine replacement part available from Rinnai. * Consult a qualified electrician if direct wiring is required as it must comply with AS/NZS 5601 and AS/NZS 3000 and other...
  • Page 6: Clearances From Combustibles

    Clearances from combustibles The below diagrams are to assist people in determining the clearance area around the Ember without having the unit on site. The 4-sided frame is shown as this is the frame used in mock chimney installations, which typically have mantels and surrounds made of combustible material. The clearances listed below, measured from the edge of the glass, are The 4-sided frame sits approximately 26 mm below the engine, refer dimension diagrams.
  • Page 7: Tv Installation

    TV installation with the TV manufacturer—some have warranty conditions that state a TV is not to be installed above a fireplace. Rinnai does not accept any responsibility for damage to a TV resulting from the use of this information. 400 mm...
  • Page 8: Ember Masonry Installation Overview

    Ember masonry installation overview Make sure the chimney cap is Check the size of the chimney before weathertight. Flexi flue also needs to be doing anything. It needs to be at least secured to the flue cowl using the clamps 200 x 200 mm for the colinear flexi flue provided—these need to be riveted/ Modify the enclosure...
  • Page 9: Ember Mock Chimney Installation Overview

    Ember mock chimney installation overview Self-supporting coaxial flue; inner Flue cowl needs to a 500 mm clearance from Ø 100 mm, outer Ø 170 mm. Requires the nearest ridge line of the roof. In this instance Modify the enclosure 10 mm clearance to a combustible the flue pipe has been painted to match the Ensure the enclosure meets the requirements set out on p.
  • Page 10: Installing The Zero Clearance Frame

    Installing the zero clearance frame Attaching the flexi flues to the spigot plate The flexi flues need to be securely fixed to the engine spigot plate using the For mock chimney installations the zero clearance frame is a mandatory clamps provided. To do this the spigot plate needs to be temporarily removed requirement to ensure a safe installation for the homeowner.
  • Page 11: Burn Media Installation

    Burn media installation Adding the glass and vermiculite Experience has shown that the majority of performance problems This step is common to both models and both types of burn media. It requires are caused by burn media being installed incorrectly. Please take removing the upper burn media tray to access the mesh holding tray.
  • Page 12: Log Set Installation

    Log set installation Step 1: Back log Place the back log onto the two log location brackets at the back of the burner. The charred side faces to the front. The log set is packaged separately and consists of five log pieces. Use extreme care when handling the logs, they are made from fragile material and will damage easily.
  • Page 13: Stone Set Installation

    Stone set installation Step 1: Back row of stones Place the back row of stones as shown. The stone set is packaged separately. Use extreme care when handling the stones, Ember 600 Ember 700 they are made from fragile material and will damage easily. While the stone sets for the Ember 600 and 700 are different (Ember 600 has six less stones), the installation steps are the same.
  • Page 14: Commissioning

    Commissioning Installing the frame Easy four stage process, which will be the same regardless of frame type, for The gas pressures must be checked against those printed on the data plate of the example 3-sided frame, 4-sided frame, or the 700 masonry frame. appliance.
  • Page 15: Test Operation And Lighting Sequence

    If the appliance cannot be made to perform 13 12 11 10 9 8 7 6 5 4 3 2 1 gr/y correctly please contact Rinnai. Abnormal flame pattern 12 11 10 9 8 7 6 5 4 3 2 1...
  • Page 16: Ember Flueing

    Wall straps have been included in the Rinnai vertical flue kits. Elbow straps are also available as a separate General flueing guidelines component to prevent excess weight on the flue elbow.
  • Page 17: Flueing Options

    Flueing options Flueing options Horizontal terminations (mock chimney) Vertical terminations (mock chimney) Dimensions are in mm unless otherwise stated Dimensions are in mm unless otherwise stated 2 m max. 2 m max. 5 & 6 Important The horizontal flue length must not be greater than the vertical.
  • Page 18: Vertical Termination (Masonry Chimney)

    Flueing options Flue kits and components Vertical and horizontal termination (masonry only) Mock chimney vertical flue kit 3.6 m Mock chimney horizontal flue kit Code: R3665 Code: R3654 Dimensions are in mm unless otherwise stated Coaxial vertical flue kit Coaxial horizontal flue kit that attaches to the that attaches to the Ember Ember Adaptor.
  • Page 19 Flue kits and components Ember flue adaptor Flue pipes Flue extension Horizontal flashing kit Horizontal wall terminal Roof cowl Code: R3653 150 mm: R3630 75-175 mm: R3638 Code: R3646 Code: R3650 Code: R3651 230 mm: R3631 75-360 mm: R3639 Colinear to coaxial adaptor. 300 mm: R3632 Flashing components used...
  • Page 21 Experience our innovation Rinnai.co.nz 0800 746 624 http://www.youtube.com/rinnainz Ember Installation Guide: 12890-B 02-18 http://www.facebook.com/rinnainz...

This manual is also suitable for:

Rdv600nRdv700nRdv700lRdv600l

Table of Contents