Test operation and lighting sequence

It may take approximately two hours of operation for the burn media to achieve their full
flame pattern and glow. During the initial burning in period, some smoke and smell may be
experienced. The appliance should run on the high setting in a well ventilated room until these
dissipate. It is important to check the flame pattern during this time.
Abnormal flame pattern
Abnormal flame performance and/or pattern
can indicate a problem with your fire, such as
blocked gas injectors, or that the burn media
has shifted. There are some warning signs that
could indicate a problem.
- Unusual smell from the appliance
- Continued difficulty or delay in
establishing a flame
- Flame appears either very short or very
long
- Flame only burns part way across the
burner
- Severe soot building up on the inside of
the glass door
It is the responsibility of the installer to check that under normal conditions of the
appliance, all flue gases are exhausted to the outside atmosphere, and that there is
no spillage of combustion gases into the room.
If the appliance cannot be made to perform correctly please contact Rinnai.
Installation checklist and customer handover
Complete the installation checklist in the customer operation guide, and make sure you leave
the guide with the customer. Explain to the customer about the use and care of the unit, and
ensure they understand the instructions, operation of the appliance, and the importance of
regular servicing.
16 | Arriva 752 Installation Guide: 12218-F 06-18
Normal flame pattern
Abnormal flame pattern

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rhfe752etrnRhfe752etrl

Table of Contents