Preparing To Install; Installation - Baicells Atom OD040615 User Manual

Low-gain & high-gain cpe
Table of Contents

Advertisement

Table 4: Interfaces
Interfaces vary by model – not all models will have all of the interfaces listed below.
Interfaces
PoE
TF or SD Slot
SIM/USIM Slot
RESET
GND

5 Preparing to Install

To help ensure a smooth and successful installation, check that you have all of the parts, materials, and
tools you will need, per
placing the CPE so that it faces the nearest eNB. You may need to adjust the tilt and angle for optimum
signal reception.
If you are installing the outdoor CPE with a Baicells SNAP PoE Router, please refer to the
. There will be some installation differences.
Installation Guide
At the time of this publication, the SNAP PoE Router is supported on the following ODU CPE models:
Atom OD04H - Outdoor CAT4 high-gain CPE, model EG7035E
Atom OD04L - Outdoor CAT4 low-gain CPE, model EG7035L
Atom OD06H - Outdoor CAT6/7 high-gain CPE, model EG7010A
Atom OD06L - Outdoor CAT6/7 low-gain CPE, model EG7010C
Atom OD06-LX – Outdoor CAT6/7 low-gain CPE, model EG8013L
Atom OD15 - Outdoor CAT15 high gain CPE, model EG8015G

6 Installation

Follow the steps below to install the outdoor unit.
1. Loosen the screws on the CPE's waterproof cover, and open the cover.
2. Insert the service provider's SIM/USIM card into the card slot (Figure 6 and Figure 7).
ATTENTION: Never power on the unit while installing or uninstalling the USIM card. Doing
so could damage the card and the unit.
Description
Power over Ethernet (PoE) power adaptor
Card slot for a secure digital (SD) card
Universal Subscriber Identity Module card slot, 1.8 V/3.0 V USIM 2FF
Reset/restore button
Ground lug. The unit is connected to Earth by conductor.
section
3. When selecting the best outdoor location for the installation, plan on
12
SNAP PoE Router

Advertisement

Table of Contents
loading

Table of Contents