Figure 18: Threaded Rod; Figure 19: Omega Clamps; Figure 20: Mark Holes For Drilling - Baicells Atom OD040615 User Manual

Low-gain & high-gain cpe
Table of Contents

Advertisement

b2) Install the threaded rod onto the bracket (Figure 18).

Figure 18: Threaded Rod

b3)
Hold the assembly up to the pole. Attach the two omega clamps to the threaded
rods with M8 nuts and tighten them (Figure 19).

Figure 19: Omega Clamps

b4)
The CPE is now ready for installation at its final outside location. Proceed to
section
10. Wall installation:
a.
Low-Gain CPE:
a1) Slip the bracket off of the Atom unit, and fit it on the wall to mark the drilling
locations (Figure 20).

Figure 20: Mark Holes for Drilling

a2) At the marked locations, drill four 0.4 in. (10 mm) diameter and 2.8 in. (70 mm)
depth holes.
a3) Check the up/down direction of the bracket, and then fix it on the wall using the M5
tapping screws (Figure 21).
7.
18

Advertisement

Table of Contents
loading

Table of Contents