Removing The Monitor Board And Spo2 Modules - ZOLL Propaq M Service Manual

Hide thumbs Also See for Propaq M:
Table of Contents

Advertisement

Removing the Monitor Board and SpO
Tool Required
# 1 Phillips screwdriver with torque capability
Setup
This procedure should be conducted on a static mat.
Wear a wrist strap to ground during the procedure.
Complete these procedures in the following order before performing this procedure:
1.
2.
3.
4.
5.
Note:
To reinstall the monitor board and/or SpO
Monitor Board and/or SpO
1
2
9650-0804-01 Rev. A
"Removing the Handle" on page 43
"Disassembling the Main Unit" on page 44
"Removing the Front Enclosure Module" on page 47
"Removing the Display Module" on page 49
"Removing the EtCO2 and NIBP Modules" on page 51
After replacing the Monitor Board and/or SpO
Life Cycle Counters" to reset the life cycle counter for the module.
Disassembly
2
Remove the EtCO2 anti-conductive shield
that lies on top of the unit.
Remove six (6) screws to release the
monitor board in the areas illustrated.
Note: During reassembly, torque screws to
6 in-lbs.
ZOLL Propaq M Service Manual

Removing the Monitor Board and SpO2 Modules

modules, see Chapter 4, "Resetting
2
modules, reverse the steps.
2
Modules
2
shield
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents