Receipt Of Goods And Storage; Installation Instructions - M&C PSS SS-5 Instruction Manual

Gas conditioning unit
Table of Contents

Advertisement

10

RECEIPT OF GOODS AND STORAGE

The gas conditioning and sampling system SS-5... is a completely pre-fitted unit.
 Please take the gas conditioning system and possible special accessories carefully out of the
packaging material immediately after arrival, and compare the goods with the items listed on the
delivery note;
 Check the goods for any damage caused during delivery and, if necessary, notify your transport
insurance company without delay of any damage discovered.
N O T E !
11

INSTALLATION INSTRUCTIONS

N O T E !
www.mc-techgroup.com
The equipment should be stored in a protected, frost-free room!
The equipment is to be used in a vertical position only. The perfect
functioning of the seperation and drainage procedures will only be
guaranteed if the equipment is used in a vertical position.
The gas conditioning system should be installed in an area well
away from any heat emitting sources in order to prevent demage
caused by an accumulation of heat.
Pay attention to a non critical installation for individuals.
The compact gas conditioning system is preferably designed for
mounting in a cabinet. When the cabinet is installed outside, ample
protection against the effects of direct sunlight and dampness
must be provided. In winter, the equipment must only be used in
frost-free areas; Schutzart der Gasaufbereitung beachten.
For mounting of the compact gas conditioning system the
supplied distance bolts (M5, 15mm) have to be used.
In order to guarantee the operational safety of the gas conditioning
system and the additionally connected analysers, and to avoid
false alarms, the gas conditioning system should not be used at
temperatures other than those specified.
It is of great importance that the analysers which have been
additionally connected be used at temperatures well above the
specified gas outlet dew point of +5°C. This prevents the gas in the
connector lines from condensing completely.
In the event of the unheated sample gas lines being connected to
the gas conditioning system on a slope, it is not necessary to carry
out a preliminary condensate removal.
SS-5, SS-5/3 | 1.00.01
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pss ss-5/3

Table of Contents