5. Hook a second lifting device to the Reel Cross Tube.
6. Remove the shipping brackets shown by
removing the nuts that connect to the bucket.
Lift the Grate Assembly out of the bucket.
Discard these shipping brackets.
Titan 5000 Series II 01/22
© 2022 Alamo Group Inc.
ASSEMBLY
Assembly Section 3-4