Installation - Toshiba V Series User Manual

Integrated controller
Hide thumbs Also See for V Series:
Table of Contents

Advertisement

Chapter 3 Installation & Wiring
3.2.6

Installation

3
48
Prior to installing equipment, check that the location, anchor bolt positions, and cable
through-hole positions comply with the drawing. Confirm that anchor bolt positions of
each equipment are proper relative to the channel base.
It is recommended to fix the equipment by the following method.
Fixation on free-access floor
Fix the equipment on a fixed platform or equivalent foundation, as shown in figure 3-6.
Channel base
Anchor bolt
Figure 3-6 Fixation on Free-access Floor
Fixation on concrete floor
Place a channel base directly on the concrete floor over the pit, and fix the channel base
with anchor bolts, as shown in figure 3-7.
Channel base
Anchor bolt
Console
Platform
Console
Figure 3-7 Fixation on Concrete Floor
model 3000 Loop Controller L3 User's Manual - Basic Hardware -
Free-access floor
Concrete floor
(Foundation)
Cable pit

Advertisement

Table of Contents
loading

This manual is also suitable for:

3000

Table of Contents