Unpacking; Mains Supply; Positioning - NUVE BM 15 Instruction Manual

Stirred water baths
Table of Contents

Advertisement

5.3. UNPACKING

Open the packing cardboard box. Remove the nylon packing wrapped around the device. The
items provided with the device are listed below, please check them.
1 ea. user's manual and warranty certificate
1 ea. power cable
1 ea. perforated grid

5.4. MAINS SUPPLY

The stirred water bath requires 230 V, 50/60 Hz.
Please make sure that the supplied mains matches the required power ratings which are written
on the name plate of the instrument located at the back of the steam sterilizer
Always plug-in the instrument to correctly grounded sockets.
A supply fitted with a circuit breaker should be used for protection against indirect
contact in case of an isolation fault.

5.5. POSITIONING

 Check that no damage occurred during transportation.
 Check that the positioning is suitable for the users.
 Check that the water bath is stable on its four feet.
 Check that the user will be able to follow up the operation even when he deals with
something else.
 Check that the positioning of the water bath prevents interference with other equipment in
the near surrounding.
 Check that the place of the water bath is clean.
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm 30

Table of Contents