Operating Principles; Operating The Unit; Programming - NUVE BM 15 Instruction Manual

Stirred water baths
Table of Contents

Advertisement

6. OPERATING PRINCIPLES

6.1. OPERATING THE UNIT

 Switch on BM series stirred water bath by using the power switch and ensure that the
power switch led is on.
 Observe that command and display panel is activated.
 Learn the functions of command and display panel (see. Section 5.7).
 Set the values and start the operation.
Please check of the liquid level in the tank during long operations and refill to the may
line if necessary.

6.2. PROGRAMMING

Push the temperature set key.
Set the temperature by pushing the value increase/decrease keys on the
temperature adjustment side.
Push the temperature set key again to save the temperature value.
Push the time set key.
Figure 4
12
MAX. LINE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm 30

Table of Contents