Appendix; Optional Cards; Installation - gefran ADL500 Quick Start Up Manual, Specification And Installation

Vector inverter for lifts with synchronous/asynchronous motors
Table of Contents

Advertisement

Appendix

A.1 - Optional cards
A.1.1 - Installation
Only one option card can be installed, either an EXP-IO1-ADL500 or an EXP-DCP-ADL500.
Use only the screws supplied with the option card.
Caution
1.
Use a Phillips screwdriver (Ph2) to loosen the 4 M3 screws (2) and then remove the top cover (1);
2.
Secure the optional board (3) by inserting the option board's J1 female connector onto the control board's J1
male connector;
3.
Tighten down the 2 M3 screws supplied with the option board (4);
4.
Replace the upper cover (1) and tighten down the 4 M3 screws (2).
2
ADL500 • Quick installation guide - Specifications and connection
1
4
3
87

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adl510Adl530Adl550

Table of Contents