Installing The Device In Customer Installation Location - SMA PPM-10 Installation Manual

Power plant manager
Hide thumbs Also See for PPM-10:
Table of Contents

Advertisement

SMA Solar Technology AG
6. Turn 2 suitable screws with washers through the holes in the lower
wall mounting brackets.
7. Tighten all 4 screws.
8. Ensure that the product is securely in place.
5.3

Installing the Device in Customer Installation Location

Own devices can be installed if the product has a customer installation location.
Requirements:
☐ The device must be approved for operation at the installation site. In Europe, there must be a valid EC declaration
of conformity for the device for example.
☐ The circuit diagram of the product must be provided.
☐ The device must meet the following technical requirements:
– Permissible ambient temperatures: -20°C to +60°C (-4°F to +140°F)
– Emitted interference: Class A (as per EN55022: 2006+A1: 2007)
– Interference immunity: Class A (as per EN55024: 1998+A1: 2001 +A2:2003)
☐ The device can be mounted on a DIN rail.
☐ The device has suitable dimensions for the available space (width x height x depth): 590 mm x 165 mm x
125 mm (23.2 in x 6.5 in x 4.9 in)
☐ The device must be suitable for connection to voltage supply:
– AC voltage supply (see details on type label of product) or DC voltage supply (24 V DC)
– Maximum power consumption: 20 W
Procedure:
1. Mount each device on the DIN rail of the product.
2. Ensure that the device is firmly attached to the DIN rail.
Installation Manual
5 Mounting
PPM-10-IA-en-16
23