2 Safety
Electrical installations (for North America)
All installations must conform with the laws, regulations, codes and standards applicable in the jurisdiction of
installation (e.g. National Electrical Code
• Before connecting the product to the utility grid, contact your local grid operator. The electrical connection of
the product must be carried out by qualified persons only.
• Ensure that the cables or conductors used for electrical connection are not damaged.
12
PPM-10-IA-en-16
®
ANSI/NFPA 70 or Canadian Electrical Code
SMA Solar Technology AG
®
CSA-C22.1.).