Cable requirements:
☐ UV-resistant for outdoor use
☐ Number of conductor pairs and conductor cross-section: at least 2 x 2 x 24 AWG
(2 x 2 x 0.22 mm
☐ External diameter of cable:
– When using conduits: the maximum diameter of the cable depends on the size of the
enclosure opening at the bottom of the inverter and the number of network cables to be
inserted through the opening (see Section 5.1 "Mounting Position and Cable Route",
page 16).
– If using the supplied cable gland: max.
☐ Cable category: Cat5, Cat5e, Cat6, Cat6a, Cat7
☐ Cable shield: SF/UTP, S/UTP, SF/FTP, S/FTP
☐ Plug type: RJ45 for Cat5, Cat5e, Cat6, Cat6a
☐ Cable length between two nodes: max. 164 ft (50 m) with patch cable, max. 328 ft (100 m)
with installation cable
SMA recommends the following cable types:
• For outdoor use: SMA COMCAB-OUTxxx
• For indoor use: SMA COMCAB-INxxx*
The cables are available in the lengths xxx = 328 ft (100 m), 656 ft (200 m), 1,640 ft (500 m) and
3,280 ft (1,000 m).

5.3 Installing the Speedwire/Webconnect Data Module

1.
Danger to life due to electric shock when opening the inverter
High voltages are present in the conductive components of the inverter. Touching live
components results in death or serious injury.
• Disconnect the inverter from voltage sources on the AC and DC sides and open it (see the
inverter installation manual). Observe the waiting time to allow the capacitors to
discharge.
2. Release the screw of the display far enough to
allow the display to be flipped up.
3. Flip the display up until it clicks into place.