SMA PPM-10 Installation Manual page 67

Power plant manager
Hide thumbs Also See for PPM-10:
Table of Contents

Advertisement

SMA Solar Technology AG
Overload limits for gensets
Standby time until required grid disconnection at an over-
load of 10% to 20%*
Standby time until required grid disconnection at an over-
load of 5% to 10%*
Grid disconnection at an overload of less than 5%*
* In relation to the nominal power of the genset
System limits for PV inverters
Maximum permitted nominal power of all PV inverters
Maximum permitted number of PV inverters*
* depending on the ordered option
Installation Manual
10 Technical Data
at least 1 s
at least 3 s
is prohibited
not limited
200
PPM-10-IA-en-16
67