SMA PPM-10 Installation Manual page 38

Power plant manager
Hide thumbs Also See for PPM-10:
Table of Contents

Advertisement

6 Electrical Connection
Block circuit diagram for 3-conductor utility grid with 3 line conductors
L1
L2
L3
Figure 21: Current measurement within the 3-conductor utility grid (example)
Voltage measurement 1
L1
1
L1
L2
L3
Figure 22: Voltage measurement within the 3-conductor utility grid (example): with and without voltage converter
Also see:
> Section 6.4.3 "Connecting the Current Transformer", page 39
> Section 6.4.4 "Connecting the Voltage Measurement", page 43
38
PPM-10-IA-en-16
Current measurement 1
k1
l1
k2
l2
*
*
1
2
3
4
L2
L3
N
PE
*
2
3
4
5
* In the three-conductor utility grid, use for the selected connecting terminal plate X200 the red jumper between N and PE.
Current measurement 2
k3
l3
k4
l4
k5
l5
*
*
5
6
7
8
9
10
* Remove jumper on the wired terminals of the connecting terminal plate X700.
Voltage measurement 1
L1
1
L1
L2
L3
SMA Solar Technology AG
k6
l6
lx
*
*
11 12
13
L1
L2
L3
L1
L2
L3
L2
L3
N
PE
*
2
3
4
5
Installation Manual

Advertisement

Table of Contents
loading

Table of Contents