SMA Solar Technology AG
The block circuit diagrams introduced in this section, describe the connection of the inputs for the current and voltage
measurement using the example of current measurement 1, current measurement 2 and voltage measurement 1. The
same block circuit diagrams apply to all other current and voltage measurements.
Block circuit diagram for 4-conductor utility grid with 3 line conductors and 1 neutral conductor
L1
L2
L3
N
Figure 19: Current measurement within the 4-conductor utility grid (example)
Voltage measurement 1
L1
1
L1
L2
L3
N
* If measured with voltage converter, use for the selected voltage measurement at the connecting terminal plate X200 the red jumper between N and PE.
Figure 20: Voltage measurement within the 4-conductor utility grid (example): with and without voltage converter
Installation Manual
Current measurement 1
k1
l1
k2
l2
*
*
1
2
3
4
L2
L3
N
PE
2
3
4
5
Current measurement 2
k3
l3
k4
l4
k5
l5
*
*
5
6
7
8
9
10
* Remove jumper on the wired terminals of the connecting terminal plate X700.
Voltage measurement 1
L1
L2
1
2
L1
L2
L3
N
6 Electrical Connection
k6
l6
lx
*
*
11 12
13
L1
L2
L3
N
L1
L2
L3
N
L3
N
PE
*