SMA PPM-10 Installation Manual page 48

Power plant manager
Hide thumbs Also See for PPM-10:
Table of Contents

Advertisement

6 Electrical Connection
Insulated conductor
pair
2
3
4
• Shorten protruding conductors.
• Insert the cable organizer in the enclosure. Ensure that the
white arrow of the cable organizer is pointing towards the
white arrow on the enclosure.
☑ The cable organizer snaps into place.
• Push the folding parts of the enclosure back together using a suitable pair of pliers (e.g., pipe wrench).
☑ The folding parts of the enclosure snap into place.
• Secure the cable retainer of the enclosure with a cable tie.
• Cut off the protruding end of the cable tie.
3. Push the RJ45 Keystone jacks into the cutouts of the module until they lock into place.
4. Secure the network cables to the metal bracket with the Velcro strip provided.
Mounting the modules of the patch panel
1. Insert the module with the installed cables in the enclosure of the patch panel.
48
PPM-10-IA-en-16
Insulated conductor
color
white/orange
orange
white/green
green
white/brown
brown
SMA Solar Technology AG
Contact-568A
3
6
1
2
7
8
Contact-568B
1
2
3
6
7
8
Installation Manual