Download Print this page

Front Wall - Heartland VALUE Series Assembly Manual

Belmont 8' x 10' (244 x 304,8 cm)
Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x2
3/8 x 20 x 72" (1 x 50,8 x 182,9 cm)
x1
PT
2 x 3 x 96" (5,1 x 7,6 x 243,8 cm)
BEGIN
1
Orient PT on edge and place LEFT panel on PT as shown with
primed side facing up.
Use BV as a temporary support as shown.
2
Nail using 2" nails 4" apart.
3
Repeat steps 1-2 for RIGHT panel.
(50,8 cm)
Flush
2" (5,1 cm)
Nails
(10,2 cm)

FRONT WALL

x2
20"
4"
MAINTAIN DIMENSION
BV
2 x 3 x 17-1/2" (5,1 x 7,6 x 44,5 cm)
TEMPORARY SUPPORT
HINT:
96"
(243,8 cm)
56"
(142,2 cm)
1-1/2"
(3,8 cm)
56"
(142,2 cm)
BETWEEN PANELS
Primed side up
2x3 temporary support
20
x8
2" (5,1 cm)
PT
20"
(50,8 cm)
Flush

Advertisement

loading