PARTS REQUIRED:
x2
JDA
TEMPORARY
2 x 4 x 80-11/16" (5,1 x 10,2 x 204,9 cm)
BEGIN
Stand backwall on floor.
It is important to secure the backwall in the following order.
ENSURE 4" MEASUREMENT IS AT TOP OF BACK WALL ASSEMBLY.
Center back wall assembly on the 144" floor dimension.
1
Use (2) JDA as a temporary brace. Level wall and
2
secure JDA with two 3" screws
First, nail lower edge of panel to floor frame using 2" nails 6" apart.
3
Angle nail to hit floor frame (Fig. B).
Secure side wall bottom plate to floor using 3" nails (Fig. B).
4
3" Nails into bottom plate.
FINISH
You have finished standing your BACK WALL.
5

BACK WALL INSTALLATION

(Fig. A)
.
22
x2
3" (7,6 cm)
x12
x25
2" (5,1 cm)
4"
(10,2 cm)
Fig. A
3" (7,6 cm)
Fig. B
3" (7,6 cm)
JDA
3" (7,6 cm)
Screws x2
Nail 2" nails first.
Nails
2" (5,1 cm)
Nails