Poe Setup - ZyXEL Communications GS2220 Series User Manual

Hide thumbs Also See for GS2220 Series:
Table of Contents

Advertisement

Basic Setting > PoE Setup > PoE Time Range Setup
Fig ure 93
The following table describes the labels in this screen.
Table 35 Basic Setting > PoE Setup > PoE Time Range Setup
L ABEL
Port
Time Range
Apply
Clear
Port
Time Range
Profiles
Delete
Cancel
8.8.2 Po E Se tup
Use this screen to set the PoE power management mode, priority levels, power-up mode and the
maximum amount of power for the connected PDs.
Click the
Po E Se tup
Chapter 8 Basic Setting
DESC RIPT IO N
Enter the number of the port to which you want to apply a schedule.
This field displays the name of the schedule that you have created using the
>
screen.
Applic a tio n
T im e Ra ng e
Select a pre-defined schedule to control when the Switch enables PoE to provide power on the
port. To select more than one schedule, press [SHIFT] and select the choices at the same time.
Click
to save your changes to the Switch's run-time memory. The Switch loses these
Apply
changes if it is turned off or loses power, so use the
your changes to the non-volatile memory when you are done configuring.
Click
to clear the fields to the factory defaults.
C le a r
This field displays the index number of the port. Click a port number to change the schedule
settings.
This field displays the name of the schedule which is applied to the port.
PoE is enabled at the specified time or date.
Select an entry's check box to select a specific entry. Otherwise, select the check box in the
table heading row to select all entries.
Check the rules that you want to remove and then click the
Click
to clear the selected check boxes.
C a nc e l
link in the
Ba sic Se tting
GS2220 Series User's Guide
link on the top navigation panel to save
Sa ve
>
screen. The following screen opens.
Po E Sta tus
117
Adva nc e d
button.
De le te

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents