Test Procedure

6.3 Control Loop Gain and Phase Measurement Procedure

The TPS546B24AEVM-2PH includes a 49.9-Ω series resistor in the feedback loop for V
accessible at the test points TP17 and TP18 for loop response analysis. These test points should be used during
loop response measurements as the perturbation injecting points for the loop. See the description in
Table 6-3. List of Test Points for Loop Response Measurements
Test Point Node Name
Description
TP18
CH_B
Input to feedback divider of V
TP17
CH_A
Resulting output of V
Measure the loop response with the following procedure:
1. Set up the EVM as described in
2. For V
, connect the isolation transformer of the network analyzer from TP18 to TP17.
OUT
3. Connect the input signal measurement probe to TP18. Connect the output signal measurement probe to
TP17.
4. Connect the ground leads of both probe channels to TP20.
5. On the network analyzer, measure the Bode as TP18/TP17 (In/Out).
16
TPS546B24A 2-Phase SWIFT™ Step-Down Converter Evaluation Module
User's Guide
Comment
The amplitude of the perturbation at this node should be limited to less than 30 mV.
OUT
Bode can be measured by a network analyzer with a CH_B/CH_A configuration.
OUT
Section
4.2.
Copyright © 2022 Texas Instruments Incorporated
. The resistor is
OUT
SLUUC48A – FEBRUARY 2020 – REVISED FEBRUARY 2022
Submit Document Feedback
www.ti.com