First steps
Commissioning
The measuring instrument is supplied with a rechargeable battery
already fitted.
> Charge the rechargeable battery fully before using the
measuring instrument, see Charging the battery, page 60.
Getting to know the product
Mains operation
If the mains unit is connected, the measuring instrument is
automatically powered from the unit.
1. Connect the mains unit instrument plug to the instrument's
micro USB socket.
2. Connect the mains plug of the mains unit to a mains socket.
During mains operation the battery is charged
automatically.
Connecting probes
Probe detection at the flue gas socket is carried out
continuously. New probes are recognised automatically.
Connect a probe to the probe socket before switching on
the measuring instrument or start sensor detection
manually after changing the probe:
detection.
Connecting flue gas probes/gas pressure
adapters/temperature adapters
Testo-Direct