File Verification - ABB RELION REB500 Engineering Manual

Distributed busbar protection
Hide thumbs Also See for RELION REB500:
Table of Contents

Advertisement

1MRK 511 452-UUS Rev. A
9.38

File verification

Warning: Of course, the file verification tool can check the setfile internal configuration only. It is the responsibility of
the user to check that the REB500 configuration is in accordance with the configuration of the protected station.
IEC18000864 V1 EN-US
Distributed busbar protection REB500
Engineering manual
(1) Start verification
Press Start.
© 2020 Hitachi Power Grids. All rights reserved
Annex B | Configurator mode - System configuration
File verification
After the configuration of the setfile has been completed,
it must be verified. The File verification tool checks the
plausibility and completeness of the bus configuration,
hardware-configuration and the assignments.
(2) Check test result
The test result must be:
Number of errors: 0
Number of warnings: 0
Section 9
GUID-82785E56-AF1B-4EFA-94EB-429EB3F48FE5 v2
87

Advertisement

Table of Contents
loading

Table of Contents