Section 4
HMI500
to document and distinguish different sets of settings. When a new index is assigned, the
current date on the PC is recorded as the date of the last change.
IEC18000503 V1 EN-US
Figure 59: Version
4.9.2
File verification
Starts the file verification procedure, that checks data consistency within several tables of the
project file. The result is displayed in a separate window.
66
© Copyright 2019 ABB. All rights reserved
1MRK 500 132-UEN B
12000099-IEC18000503-1-en.vsdx
GUID-68B3B3E6-FF61-4B87-909C-1A5F1775B16E v1
Distributed busbar protection REB500
Operation manual