Commissioning And Testing; Turn-Up - ADTRAN Total Access 300 Series Installation And Maintenance Manual

Gige sfu ont with rf overlay
Hide thumbs Also See for Total Access 300 Series:
Table of Contents

Advertisement

Total Access 300 GigE SFU ONT with RF Overlay Installation and Maintenance Guide

Commissioning and Testing

This section provides detailed information on the following:
• Turn‐Up, see below
• Additional tests: Depending on the local service provider's requirements the technician 
• "Secure the Unit" on page 39
• "Test for POTS Line Faults" on page 39
• "Provision Ethernet Interface at OLT" on page 40

Turn-Up

Initial turn‐up of the ONT involves applying power and observing LEDs for status infor‐
mation. To complete the turn‐up of the ONT, complete the following steps:
1.Plug the green UPS connector into the male connector of the UPS.
2. Check to ensure the AC, output, and battery LEDs are green and functioning. The UPS is 
3. View the LEDs on the ONT as they cycle through start‐up diagnostics. A properly 
38
may be required to perform additional tests beyond the ONT on the Customer Premises 
Equipment (CPE) wiring and/or equipment. If this is the case, a GPON power meter may 
be used to test the upstream and downstream signal types for voice, data and video. 
now ready for normal operation.
installed ONT cycles through a sequence of operations during startup and power‐up 
phases. Table
9 on page 39 shows the normal LED status once the startup and power‐up 
sequences are complete (approximately 30 seconds)
In addition to the front panel LEDs, the ONT has LEDs that are integral to the Ethernet 
RJ‐45 jacks.
6418771XGX-5B