Commissioning and Testing

This section provides detailed information on the following:
• Turn‐Up, see below
• Depending on the local service provider's requirements the technician may be required to 
• "Secure the Unit" on page 38
• "Test for POTS Line Faults" on page 38
• "Provision Ethernet Interface at OLT" on page 39

Turn-Up

Initial turn‐up of the ONT involves applying power and observing LEDs for status infor‐
mation. To complete the turn‐up of the ONT, complete the following steps:
1.Plug the green UPS connector into the male connector of the UPS.
2. Check to ensure the AC, output, and battery LEDs are green and functioning. The UPS is 
3. View the LEDs on the ONT as they cycle through start‐up diagnostics. A properly 
6418770XGX-5B
perform additional tests beyond the ONT on the Customer Premises Equipment (CPE) 
wiring and/or equipment. If this is the case, a GPON power meter may be used to test the 
upstream and downstream signal types for voice, data and video. 
now ready for normal operation.
installed ONT cycles through a sequence of operations during startup and power‐up 
phases. Table
9 on page 38 shows the normal LED status once the startup and power‐up 
sequences are complete (approximately 30 seconds)
In addition to the front panel LEDs, the ONT has LEDs that are integral to the Ethernet RJ‐
45 jacks.