Total Access 300 GigE SFU ONT with RF Overlay Installation and Maintenance Guide

Installation of the Power Supply

!
WARNING
•  Before making any power connections to this equipment, verify the power
is off (fuse removed/breaker tripped).
•  This equipment should only be operated from the type of certified/listed
power supply supplied by the manufacturer with the equipment
To install the uninterruptible power supply (UPS) complete the following steps:
1.Select a location for the UPS. When making this determination, consider the following:
2. Use the template enclosed with the unit to mark the installation location.
3. Remove the battery cover from the UPS unit and remove the strap from the battery 
4. Disconnect the battery cable at the battery terminals if already connected to the battery.
5. Remove the battery.
6. Mount the UPS using screws appropriate for the total weight of the UPS and the 
7. Connect the UPS cable wires (see Figure 18).
8. Replace the battery and secure the battery with the strap.
30
• This unit is not appropriate for outdoor placement.
• Place the UPS in a safe area, free of excessive dust, and with adequate airflow.
• Refer to UPS technical specifications table for details on temperature and humidity 
requirements. Do not operate outside these specified limits.
holding it to the shelf of the unit.
mounting surface material.
Pin 1
Power/Alarm
Connector
(Note: Refer to the sticker on the bottom
of the Power/Alarm Connector if needed)
Pin 7
UPS Power
Connector

Figure 18. UPS Power Connection

1
Low Battery
2
Battery Missing
3
Replace Battery
4
On Battery
5
Signal Return
6
12V Return
7
+12VDC
6418771XGX-5B