Instructions for Installing the SFU ONT

A typical ONT installation with UPS is shown in Figure 6.
Customer provided premises
wiring including CAT5 or
higher Ethernet cable and
POTS twisted pair to be
terminated in the ONT by
technician
Riser conduit for
fiber drop cable
6 AWG ground wire
installed from the ONT
to the established MGN
Installations may vary from this diagram depending on the manner in which the Customer 
Premises Equipment (CPE) wiring is installed, the location of the AC outlet used to power the 
ONT local power supply, whether or not a communications distribution panel was provided, 
and the proximity of the external ends of the CPE wiring to the subscriber's electrical service 
point.
6418771XGX-5B
Communications
Distribution
Panel

Figure 6. Typical ONT Installation

UPS with battery backup
installed by technician
GFI/non-GFI outlet - highly
recommend non-GFI outlet
PVC conduit supplied by subscriber
with pull string for UPS low voltage
wiring installed by technician