Servicing And Inspection - Jungheinrich ECE 220 Operating Instructions Manual

Hide thumbs Also See for ECE 220:
Table of Contents

Advertisement

3

Servicing and Inspection

Thorough and expert servicing is one of the most important requirements for the safe
operation of the industrial truck. Failure to perform regular servicing can lead to truck
failure and poses a potential hazard to personnel and equipment.
M
The application conditions of an industrial truck have a considerable impact on the
wear of the service components.
We recommend that a Jungheinrich customer service adviser carries out an
application analysis on site to work out specific service intervals to prevent damage
due to wear.
The service intervals stated are based on single shift operation under normal
operating conditions. They must be reduced accordingly if the truck is to be used in
conditions of extreme dust, temperature fluctuations or multiple shifts.
The following servicing checklist indicates the operations to be performed and the
respective intervals to be observed. Maintenance intervals are defined as:
W
= Every
A
= Every
B
= Every
C
= Every
Z
W service intervals are to be performed by the customer.
During the run-in period – after approx. 100 service hours – the owner must check
the wheel nuts/bolts and re-tighten if necessary.
50
service hours, at least weekly
500
service hours, or at least annually.
1000
service hours, or at least annually.
2000
service hours, or at least annually.
F 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ece 225Ece 220xlEce 225xl

Table of Contents